Archives

Monthly Archive for: ‘June, 2013’
440A0308 440A0310 440A0312 440A0313 Some pictures of the new kitchen coming together. First picture is the main cooking line, walk in cooler/freezer, another angle of the line and the last picture is the bakery/work area. Floors are all tiled and the walls are finished. All the lighting is LED.  Waiting on additional kitchen equipment.  The hoods were fabricated by Nevtec in VT. We tried to source as much of the work and materials as possible out of VT to keep the business local. 440A0316 440A0319 440A0311 440A0321 First picture is a view from the front when you walk in. You can see the new ceilings and post and beams. The new duct work is part of the new heating system installed by Gillespie Fuels. They did a great job. Second picture is a view of the front from the inside. Third picture is a view of the line window. Last one of the "School house" lights installed. 440A0328 440A0327 440A0343440A0323 The new heating system(s) that feed that duct work upstairs. Brand new 400 amp electric service panel. Panels feeding the service installed by Northfield Electric. Last picture is the water filtration system. 440A0350 440A0315440A0348 440A0346 Picture of the new cooler/freezer from the outside. The inside walk in cooler. Both systems will utilize outside air to run more efficiently during the winter months. Some shots from upstairs that has been roughed out for a coming Yoga studio. Notice the insulation packed into the walls and ceiling. The building had no insulation for 120 years. We have made every effort to make the building as energy efficient as possible within the limitations of the old structure. For all intent and purpose the building has been completely refurbished and is as good as new. We are still waiting for the flooring to arrive from Vermont Plank and additional equipment to arrive. The signs were mounted this past week on the front and side.   front Until next time..... -Vince